Project Portfolio

Proven Performance For Any Application

StormArc
Holly Springs, NC

Holly Springs, NC

  • Superior volume detention in a tight footprint
  • Integrated flow control structure
  • Standard trailer delivery. No crane on site
  • Quick modular installation reduced project timeline
Challenge
Solution
StormArc
Suffolk Downs, MA

Suffolk Downs, MA

  • Limited bearing pressure, an engineered solution
  • Tiered system heights matched site conditions
  • Installation avoided all utility conflicts
  • Integrated with overall site landscape design
Challenge
Solution
StormArc
Depot North Salem, NC

Depot North Salem, NC

  • Reduced footprint design preserved more buildable land
  • Minimal excavation lowered overall project cost
  • Unified single detention structure system
  • Reduced labor needs on a tight project budget
Challenge
Solution
StormArc
Courier Square, SC

Courier Square, SC

  • Uniquely narrow footprint fit site constraints
  • High-volume efficiency in minimal width
  • Routed around existing utility corridors
  • No heavy crane equipment needed on-site
Challenge
Solution
CTL Septic
Outer Banks Motel, NC

Outer Banks Motel, NC

  • System installed directly under active parking lot
  • Coastal saltwater environment requires zero corrosion issues
  • Survived Hurricane Erin with zero damage
  • Maximized usable property — full parking restored
Challenge
Solution
StormArc
Holly Springs, NC

Holly Springs, NC

  • Superior volume detention in a tight footprint
  • Integrated flow control structure
  • Standard trailer delivery. No crane on site
  • Quick modular installation reduced project timeline
Challenge
Solution
StormArc
Suffolk Downs, MA

Suffolk Downs, MA

  • Limited bearing pressure, an engineered solution
  • Tiered system heights matched site conditions
  • Installation avoided all utility conflicts
  • Integrated with overall site landscape design
Challenge
Solution
StormArc
Depot North Salem, NC

Depot North Salem, NC

  • Reduced footprint design preserved more buildable land
  • Minimal excavation lowered overall project cost
  • Unified single detention structure system
  • Reduced labor needs on a tight project budget
Challenge
Solution
StormArc
Courier Square, SC

Courier Square, SC

  • Uniquely narrow footprint fit site constraints
  • High-volume efficiency in minimal width
  • Routed around existing utility corridors
  • No heavy crane equipment needed on-site
Challenge
Solution
CTL Septic
Outer Banks Motel, NC

Outer Banks Motel, NC

  • System installed directly under active parking lot
  • Coastal saltwater environment requires zero corrosion issues
  • Survived Hurricane Erin with zero damage
  • Maximized usable property — full parking restored
Challenge
Solution